
Piling
High-Torque Auger For Precise Piling
Constant hydraulic output ensures steady drilling power, maintaining perfect verticality even in rocky terrain.
Send InquiryFrom the rugged terrains of Mendoza, Argentina, to global infrastructure sites, YUFAN provides EPC contractors with total solutions for precise piling, efficient trenching, and versatile material handling.

Client Profile: A leading Solar PV System Integrator and EPC Contractor.
The Task: Installing ground-mount support structures and underground cabling in semi-arid, challenging terrain.
The Solution: By switching from manual labor to a YUFAN 2-ton (2000kg) operating weight mini excavator with Quick-Hitch attachments, the client reduced installation time by 35% and cut logistical costs by transportable via standard pickup trailers.
Beyond the auger attachment for 2 ton excavator, specialized attachments are crucial for building efficient solar farms. We offer a 4-in-1 versatility platform to solve on-site challenges.

Piling
Constant hydraulic output ensures steady drilling power, maintaining perfect verticality even in rocky terrain.

Trenching
Combines Swing Boom for offset digging and a 300mm Narrow Bucket to minimize soil displacement.

Logistics
Transform your excavator into a mobile lift with Pallet Fork, ensuring safe material handling in mud.

Safety
Zero Tail Swing design keeps the machine within track width, allowing 360° rotation without risking damage.

Power
Equipped with High-Flow Hydraulic Pumps, our H-series provides steady torque for breakers and heavy-duty augers.
Our solutions share a common core: precision and efficiency. See how YUFAN adapts to your specific field.
| Typical Scenarios | Key Construction Contents | Key Attachments | Technical Highlights |
|---|---|---|---|
| Ground PV Power Station Farmlands, Mountains | Ground leveling, pile drilling, cable trenching, material handling. | High-flow hydraulic system; Stable vertical drilling; Zero tail swing for limited space. | |
| Electrical & Telecom City roads, remote hills | Foundation excavation, underground pipeline laying, transformer bases. | Precise trench size control; Safe operation near existing pipes; Powerful demolition. | |
| Fencing Contractors Farms, Ranches | Column drilling, hole cleaning, partial site clearance. | Fast drilling; Consistent hole diameter; Easy to transport via standard trailer. | |
| Landscaping & Irrigation Parks, Residential | Drainage trenching, slope shaping, terrain restoration. | Precision terrain shaping; Minimum damage to land surface; Smooth finishing. |
If mini excavator for solar farm construction isn’t the perfect fit, consider these high-efficiency alternatives for your project.

Best for: Flat sites requiring high maneuverability and fast material movement.

Best for: Heavy-duty utility work combining deep digging and front loading.
| Feature | Mini Excavator | Skid Steer Loader | Backhoe Loader |
|---|---|---|---|
| Working Direction | Downward (Digging/Drilling) | Forward (Pushing/Carrying) | Hybrid (Load & Dig) |
| Maneuverability | ⭐⭐⭐⭐⭐ | ⭐⭐⭐⭐ | ⭐⭐ |
| Ground Pressure | Very Low (Rubber Tracks) | Medium (Tracks/Tires) | High (Heavy Weight) |
| Best Phase | Foundation & Cabling | Logistics & Cleanup | Roads & Main Grid |




A: Mini excavators are generally superior for solar piling due to their 360° rotation and swing boom. This allows for precise pile positioning without constantly moving the tracks, minimizing soil disturbance. Skid steers are faster for material transport on flat ground but lack the vertical precision required for high-tolerance PV structures.
A: Our heavy-duty augers designed for 1.8t–3.5t machines provide high-torque output specifically engineered to penetrate compacted soils, stiff clay, and semi-arid terrains often found in solar farm sites.
A: Based on our Argentina project data, a skilled operator using a 2-ton mini excavator can install between 60 to 100 piles per day. This represents a 3-4x increase in efficiency compared to traditional manual labor.
A: Yes. By utilizing our Quick-Hitch (Hydraulic Rapid Exchange) system, you can switch from an auger to a bucket or a breaker in under 30 seconds. This allows one machine to handle solar piling in the morning and security fencing installation in the afternoon, maximizing your ROI.
A: Absolutely. Our machines are equipped with high-pressure hydraulic systems. In rocky conditions, you can simply switch to a Hydraulic Breaker to fragment the rock before continuing with excavation or foundation prep. It is an ideal solution for remote telecom tower sites.
A: One of the primary advantages of our 2-ton series is its transportability. With a transport weight under 2,000kg, these machines can be moved using a standard Pickup Trailer, eliminating the need for expensive heavy-duty freight services and specialized permits.
A: Yes. We offer global parts support and online technical guidance. For large-scale EPC projects, we can provide customized “wear-part kits” to ensure zero downtime on-site, regardless of how remote the location is.
Our engineering team has supported PV projects from the deserts of Chile to the mountains of Argentina. Get a Free Site Equipment Assessment today.